Bruce Silver's 5 things left out of BPMN 2.0

  • April 15, 2009
  • Scott
  • 0 Comments

Bruce previously had a good post on the 5 things to like most about BPMN 2.  Now he’s back with the 5 things that were left out that might be the most disappointing.  Perhaps disheartening, but not completely surprising, given how difficult it is to pull these kind of specs together.  Hopefully they’ll keep at the revisions on BPMN and react to the feedback once BPMN 2.0 is approved.