Bruce Silver’s 5 things left out of BPMN 2.0
April 15th, 2009 by Scott FrancisBruce previously had a good post on the 5 things to like most about BPMN 2. Now he’s back with the 5 things that were left out that might be the most disappointing. Perhaps disheartening, but not completely surprising, given how difficult it is to pull these kind of specs together. Hopefully they’ll keep at the revisions on BPMN and react to the feedback once BPMN 2.0 is approved.
Related posts:
- A BPMN 2.0 Update from Bruce Silver
- Bruce Silver’s take on BPMN 2.0
- Takedown: Bruce Silver has had enough of the BPMN vs. BPEL Debate
- Bruce Silver’s New Book
- Bruce Silver Reviews Signavio (BPM in the Cloud?)
Tags: BPMN 2.0, Bruce Silver