Bruce Silver’s take on BPMN 2.0
March 23rd, 2009 by Scott FrancisBruce Silver has a nice article on BPMInstitute.org about the 5 things to like about BPMN 2.0 (he doesn’t discuss the 5 things not to like – perhaps material for a future post?!).
OMG votes on the proposal in June, but the history on OMG’s voting on BPM-related standards has typically been that it takes longer than I expect for things to get finalized. I won’t be shocked if final approval drags out a bit longer.
Interestingly, 4 of the 5 things Bruce mentions address weaknesses that at least one pureplay BPM vendor addresses already in their product (implementing more than what BPMN 1.0 spec requires). Let’s hope there’s more than 5 things to love about BPMN 2.0 – vigorous vendor adoption would be on my wish list!
Related posts:
- Bruce Silver’s 5 things left out of BPMN 2.0
- A BPMN 2.0 Update from Bruce Silver
- Sandy Kemsley Reviews Bruce Silver’s BPMN Training
- Takedown: Bruce Silver has had enough of the BPMN vs. BPEL Debate
- BPMN Training, Bruce Silver Style
Tags: BPMN 2.0, Bruce Silver, OMG